Follow
Professor Farhad Namdari
Title
Cited by
Cited by
Year
High-speed protection scheme based on initial current traveling wave for transmission lines employing mathematical morphology
F Namdari, M Salehi
IEEE Transactions on Power Delivery 32 (1), 246-253, 2016
1192016
Swarm robotics search & rescue: A novel artificial intelligence-inspired optimization approach
M Bakhshipour, MJ Ghadi, F Namdari
Applied Soft Computing 57, 708-726, 2017
1182017
Power differential based wide area protection
F Namdari, S Jamali, PA Crossley
Electric Power Systems Research 77 (12), 1541-1551, 2007
492007
Fault classification and faulted phase selection for transmission line using morphological edge detection filter
M Salehi, F Namdari
IET Generation, Transmission & Distribution 12 (7), 1595-1605, 2018
462018
Fault location on branched networks using mathematical morphology
M Salehi, F Namdari
IET Generation, Transmission & Distribution 12 (1), 207-216, 2018
402018
MODELLING AND DETECTION OF LIVE TREE-RELATED HIGH IMPEDANCE FAULT IN DISTRIBUTION SYSTEMS
N Bahador, farhad namdari, hamid reza matinfar
IET Generation, Transmission & Distribution, 2017
292017
Optimal coordination of overcurrent relays based on modified BAT optimization algorithm
R Kheirollahi, F Namdari
International Electrical Engineering Journal (IEEJ) 5 (2), 1273-1279, 2014
282014
Traveling wave-based protection for SVC connected transmission lines using game theory
M Khalili, F Namdari, E Rokrok
International Journal of Electrical Power & Energy Systems 123, 106276, 2020
212020
Power differential protection as primary protection of transmission lines and busbars
F Namdari, S Jamali, PA Crossley
IET Digital Library, 2008
202008
Tree-related high impedance fault location using phase shift measurement of high frequency magnetic field
N Bahador, F Namdari, HR Matinfar
International Journal of Electrical Power & Energy Systems 100, 531-539, 2018
192018
A novel approach for earthing system design using finite element method
S Samadinasab, F Namdari, M Bakhshipour
Journal of Intelligent Procedures in Electrical Technology 8 (29), 54-63, 2017
192017
Real-time voltage stability monitoring using weighted least square support vector machine considering overcurrent protection
AH Poursaeed, F Namdari
International Journal of Electrical Power & Energy Systems 136, 107690, 2022
172022
A fault location and detection technique for STATCOM compensated transmission lines using game theory
M Khalili, F Namdari, E Rokrok
IET Generation, Transmission & Distribution 15 (11), 1688-1701, 2021
142021
A framework for wide-area monitoring of tree-related high impedance faults in medium-voltage networks
N Bahador, HR Matinfar, F Namdari
Journal of Electrical Engineering and Technology 13 (1), 1-10, 2018
132018
Traveling wave‐based protection for TCSC connected transmission lines using game theory
M Khalili, F Namdari, E Rokrok
International Transactions on Electrical Energy Systems 30 (10), e12545, 2020
122020
Optimal coordination of overcurrent relays with constraining communication links using DE–GA algorithm
M Bakhshipour, F Namdari, S Samadinasab
Electrical Engineering, 1-15, 2021
112021
Optimal coordination of overcurrent and distance relays using hybrid differential evolutionary and genetic algorithms (de-ga)
S Samadinasab, F Namdari, N Shojaei, M Bakhshipour
International Electrical Engineering Journal (IEEJ) 6 (8), 1999-2008, 2015
112015
Feature extraction of tree-related high impedance faults as a source of electromagnetic interference around medium voltage power lines' Corridors
N Bahador, F Namdari, HR Matinfar
Progress In Electromagnetics Research B 75, 13-26, 2017
102017
Practical approach for planning of reliability-centered maintenance in distribution network with considering economic risk function and load uncertainly
A Yari, MR Shakarami, F Namdari, H Moradi CheshmehBeigi
International Journal of Industrial Electronics Control and Optimization 2 …, 2019
92019
Modeling trees internal tissue for estimating electrical leakage current
F Namdari, N Bahador
IEEE Transactions on Dielectrics and Electrical Insulation 23 (3), 1663-1674, 2016
92016
The system can't perform the operation now. Try again later.
Articles 1–20