Tzu-Li Chen
Tzu-Li Chen
Associate Professor of Industrial Engineering and Management, National Taipei University of
Verified email at mail.ntut.edu.tw - Homepage
Title
Cited by
Cited by
Year
An efficient hybrid algorithm for integrated order batching, sequencing and routing problem
TL Chen, CY Cheng, YY Chen, LK Chan
International Journal of Production Economics 159, 158-167, 2015
932015
Using a hybrid approach based on the particle swarm optimization and ant colony optimization to solve a joint order batching and picker routing problem
CY Cheng, YY Chen, TL Chen, JJW Yoo
International Journal of Production Economics 170, 805-814, 2015
872015
A particle swarm approach for optimizing a multi-stage closed loop supply chain for the solar cell industry
YW Chen, LC Wang, A Wang, TL Chen
Robotics and Computer-Integrated Manufacturing 43, 111-123, 2017
822017
An analysis of the structural complexity of supply chain networks
CY Cheng, TL Chen, YY Chen
Applied Mathematical Modelling 38 (9-10), 2328-2344, 2014
822014
A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—a case study for solar cell industry
YY Chen, CY Cheng, LC Wang, TL Chen
International Journal of Production Economics 141 (1), 66-78, 2013
462013
Stochastic resource allocation in emergency departments with a multi-objective simulation optimization algorithm
YY Feng, IC Wu, TL Chen
Health care management science 20 (1), 55-75, 2017
452017
A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty
JT Lin, TL Chen, HC Chu
International Journal of Production Economics 148, 21-36, 2014
342014
Multi-objective simulation optimization for medical capacity allocation in emergency department
CCW Tzu-Li Chen
Journal of Simulation, 2015
32*2015
Coordinated capacity planning in two-stage thin-film-transistor liquid-crystal-display (TFT-LCD) production networks
TL Chen, JT Lin, CH Wu
Omega 42 (1), 141-156, 2014
302014
A Hierarchy Planning Model forTFT-LCD Production Chain.
JT Lin, TL Chen, CC Huang
Int. J. Electron. Bus. Manag. 2 (1), 59-68, 2004
262004
Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming
TL Chen, CY Cheng, YH Chou
Annals of Operations Research 290 (1), 813-836, 2020
252020
Medium-term multi-plant capacity planning problems considering auxiliary tools for the semiconductor foundry
YY Chen, TL Chen, CD Liou
The International Journal of Advanced Manufacturing Technology 64 (9), 1213-1230, 2013
242013
Stochastic multi-site capacity planning of TFT-LCD manufacturing using expected shadow-price based decomposition
TL Chen, HC Lu
Applied Mathematical Modelling 36 (12), 5901-5919, 2012
232012
Critical material planning for TFT-LCD production industry
JT Lin, TL Chen, YT Lin
International Journal of Production Economics 122 (2), 639-655, 2009
212009
A stochastic programming model for strategic capacity planning in thin film transistor-liquid crystal display (TFT-LCD) industry
JT Lin, CH Wu, TL Chen, SH Shih
Computers & Operations Research 38 (7), 992-1007, 2011
202011
A hierarchical planning and scheduling framework for TFT-LCD production chain
JT Lin, TL Chen, YT Lin
2006 IEEE International Conference on Service Operations and Logistics, and …, 2006
202006
A capacity allocation and expansion model for TFT-LCD multi-site manufacturing
TL Chen, YY Chen, HC Lu
Journal of Intelligent Manufacturing 24 (4), 847-872, 2013
192013
A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing
TL Chen, JT Lin, SC Fang
Journal of Industrial & Management Optimization 6 (1), 209, 2010
162010
Capacity and product mix planning problem for TFT array multi-plant
JT Lin, TL Chen, WJ Chen
Journal of the Chinese Institute of Industrial Engineers 24 (6), 489-504, 2007
132007
Transferring cognitive apprenticeship to manufacturing process knowledge management system: A case study of small-and medium-sized coating industry
CY Cheng, TY Ou, TL Chen, YY Chen
Vine, 2014
112014
The system can't perform the operation now. Try again later.
Articles 1–20