Ali Allahverdi
Ali Allahverdi
Professor of Industrial and Managment Systems Engineering, Kuwait University
Verified email at ku.edu.kw - Homepage
Title
Cited by
Cited by
Year
A survey of scheduling problems with setup times or costs
A Allahverdi, CT Ng, TCE Cheng, MY Kovalyov
European journal of operational research 187 (3), 985-1032, 2008
14542008
A review of scheduling research involving setup considerations
A Allahverdi, JND Gupta, T Aldowaisan
Omega 27 (2), 219-239, 1999
11071999
The third comprehensive survey on scheduling problems with setup times/costs
A Allahverdi
European Journal of Operational Research 246 (2), 345-378, 2015
2622015
The significance of reducing setup times/setup costs
A Allahverdi, HM Soroush
European Journal of Operational Research 187 (3), 978-984, 2008
2452008
New heuristics for no-wait flowshops to minimize makespan
T Aldowaisan, A Allahverdi
Computers & Operations Research 30 (8), 1219-1231, 2003
2272003
A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
A Allahverdi, FS Al-Anzi
Computers & Operations Research 33 (4), 1056-1080, 2006
2002006
New heuristics for m-machine no-wait flowshop to minimize total completion time
T Aldowaisan, A Allahverdi
Omega 32 (5), 345-352, 2004
1542004
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
FS Al-Anzi, A Allahverdi
European Journal of Operational Research 182 (1), 80-94, 2007
1472007
Total flowtime in no-wait flowshops with separated setup times
T Aldowaisan, A Allahverdi
Computers & Operations Research 25 (9), 757-765, 1998
1201998
A survey of scheduling problems with no-wait in process
A Allahverdi
European Journal of Operational Research 255 (3), 665-686, 2016
1142016
New heuristics to minimize total completion time in m-machine flowshops
A Allahverdi, T Aldowaisan
International Journal of Production Economics 77 (1), 71-83, 2002
1122002
The two-stage assembly scheduling problem to minimize total completion time with setup times
A Allahverdi, FS Al-Anzi
Computers & Operations Research 36 (10), 2740-2747, 2009
942009
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times
A Allahverdi
Computers & Operations Research 27 (2), 111-127, 2000
942000
The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
A Allahverdi, FS Al-Anzi
The International Journal of Advanced Manufacturing Technology 37 (1-2), 166-177, 2008
832008
Optimizing modular product design for reconfigurable manufacturing
AS Yigit, AG Ulsoy, A Allahverdi
Journal of Intelligent Manufacturing 13 (4), 309-316, 2002
802002
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
A Allahverdi, FS Al-Anzi
International Journal of Production Research 44 (22), 4713-4735, 2006
762006
A hybrid tabu search heuristic for the two-stage assembly scheduling problem
FS Al-Anzi, A Allahverdi
International Journal of Operations Research 3 (2), 109-119, 2006
702006
Two-stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
A Allahverdi
Journal of the Operational Research Society 46, 896-904, 1995
701995
No-wait flowshops with bicriteria of makespan and maximum lateness
A Allahverdi, T Aldowaisan
European Journal of Operational Research 152 (1), 132-147, 2004
692004
No‐wait and separate setup three‐machine flowshop with total completion time criterion
A Allahverdi, T Aldowaisan
International Transactions in Operational Research 7 (3), 245-264, 2000
672000
The system can't perform the operation now. Try again later.
Articles 1–20