Follow
Cosmin Popescu
Cosmin Popescu
Verified email at ltu.se - Homepage
Title
Cited by
Cited by
Year
3D reconstruction of existing concrete bridges using optical methods
C Popescu, B Täljsten, T Blanksvärd, L Elfgren
Structure and Infrastructure Engineering 15 (7), 912-924, 2019
812019
Tests on reinforced concrete slabs with cut-out openings strengthened with fibre-reinforced polymers
SC Floruţ, G Sas, C Popescu, V Stoian
Composites Part B: Engineering 66, 484-493, 2014
732014
Strengthening of RC beams using bottom and side NSM reinforcement
C Sabau, C Popescu, G Sas, JW Schmidt, T Blanksvärd, B Täljsten
Composites Part B: Engineering 149, 82-91, 2018
592018
Failure tests on concrete bridges: Have we learnt the lessons?
N Bagge, C Popescu, L Elfgren
Structure and Infrastructure Engineering 14 (3), 292-319, 2018
462018
Concrete walls weakened by openings as compression members: A review
C Popescu, G Sas, T Blanksvärd, B Täljsten
Engineering Structures 89, 172-190, 2015
402015
Effect of cut-out openings on the axial strength of concrete walls
C Popescu, G Sas, C Sabău, T Blanksvärd
Journal of Structural Engineering 142 (11), 04016100, 2016
372016
Experimental study on shear deformation of reinforced concrete beams using digital image correlation
Z Huang, Y Tu, S Meng, C Sabau, C Popescu, G Sas
Engineering Structures 181, 670-698, 2019
322019
A multi-level strategy for successively improved structural analysis of existing concrete bridges: Examination using a prestressed concrete bridge tested to failure
N Bagge, M Plos, C Popescu
Structure and Infrastructure Engineering 15 (1), 27-53, 2019
312019
Numerical optimization of strengthening disturbed regions of dapped-end beams using NSM and EBR CFRP
G Sas, C Dăescu, C Popescu, T Nagy-György
Composites Part B: Engineering 67, 381-390, 2014
312014
Concrete walls with cutout openings strengthened by FRP confinement
C Popescu, G Sas, T Blanksvärd, B Täljsten
Journal of composites for construction 21 (3), 04016106, 2017
182017
Workflow for off-site bridge inspection using automatic damage detection-case study of the pahtajokk bridge
A Mirzazade, C Popescu, T Blanksvärd, B Täljsten
Remote Sensing 13 (14), 2665, 2021
172021
Local and global behavior of walls with cut-out openings in multi-story reinforced concrete buildings
C Sabau, C Popescu, N Bagge, G Sas, T Blanksvärd, B Täljsten
Engineering Structures 187, 57-72, 2019
162019
Framework for bridge management systems (bms) using digital twins
V Saback de Freitas Bello, C Popescu, T Blanksvärd, B Täljsten
Proceedings of the 1st Conference of the European Association on Quality …, 2022
122022
Asset management of existing concrete bridges using digital twins and BIM: A state-of-the-art literature review
V Saback, C Popescu, T Blanksvärd, B Täljsten
Nordic Concrete Research 66 (1), 91-111, 2022
102022
Assessment of RC walls with cut-out openings strengthened by FRP composites using a rigid-plastic approach
C Popescu, JW Schmidt, P Goltermann, G Sas
Engineering Structures 150, 585-598, 2017
102017
Semi-autonomous inspection for concrete structures using digital models and a hybrid approach based on deep learning and photogrammetry
A Mirzazade, C Popescu, J Gonzalez-Libreros, T Blanksvärd, B Täljsten, ...
Journal of Civil Structural Health Monitoring 13 (8), 1633-1652, 2023
92023
Influence of large-scale asperities on the shear strength of concrete-rock interface of small buttress dams
G Sas, C Popescu, D Bista, A Seger, B Arntsen, F Johansson, L Lia
Engineering structures 245, 112952, 2021
92021
Axially loaded RC walls with cutout openings strengthened with FRCM composites
C Sabau, C Popescu, G Sas, T Blanksvärd, B Täljsten
Journal of Composites for Construction 22 (6), 04018046, 2018
92018
Bridge management systems: overview and framework for smart management
V Saback de Freitas Bello, C Popescu, T Blanksvärd, B Täljsten
IABSE Congress 2021: Structural Engineering for Future Societal Needs, Ghent …, 2021
82021
Performance of SCMs–chemical and physical principles
H Justnes
PROCEEDINGS ICSBM 2019 VOLUME 2-New cementitious binders, 36, 2019
52019
The system can't perform the operation now. Try again later.
Articles 1–20