Follow
Dr Konstantinos Kirytopoulos
Dr Konstantinos Kirytopoulos
Associate Professor of Project & Risk Management, National Technical University of Athens
Verified email at central.ntua.gr - Homepage
Title
Cited by
Cited by
Year
Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects
A Qazi, J Quigley, A Dickson, K Kirytopoulos
International journal of project management 34 (7), 1183-1198, 2016
2662016
Supplier selection in pharmaceutical industry: an analytic network process approach
K Kirytopoulos, V Leopoulos, D Voulgaridou
Benchmarking: An International Journal, 2008
1582008
Facilitating sustainability transition through serious games: A systematic literature review
M Stanitsas, K Kirytopoulos, E Vareilles
Journal of cleaner production 208, 924-936, 2019
942019
Risk management for SMEs: Tools to use and how
VN Leopoulos, KA Kirytopoulos, C Malandrakis
Production Planning & Control 17 (3), 322-332, 2006
882006
Introducing the STAMP method in road tunnel safety assessment
K Kazaras, K Kirytopoulos, A Rentizelas
Safety science 50 (9), 1806-1817, 2012
812012
Integrating sustainability indicators into project management: The case of construction industry
M Stanitsas, K Kirytopoulos, V Leopoulos
Journal of Cleaner Production 279, 123774, 2021
652021
Integrated management systems: moving from function to organisation/decision view
V Leopoulos, D Voulgaridou, E Bellos, K Kirytopoulos
The TQM Journal, 2010
532010
Multiple sourcing strategies and order allocation: an ANP‐AUGMECON meta‐model
K Kirytopoulos, V Leopoulos, G Mavrotas, D Voulgaridou
Supply Chain Management: An International Journal 15 (4), 263-276, 2010
492010
Optimism bias within the project management context: A systematic quantitative literature review
J Prater, K Kirytopoulos, T Ma
International Journal of Managing Projects in Business, 2017
482017
Proactive assessment of breaches of safety constraints and causal organizational breakdowns in complex systems: A joint STAMP–VSM framework for safety assessment
K Kazaras, T Kontogiannis, K Kirytopoulos
Safety science 62, 233-247, 2014
432014
Holistic investment assessment: optimization, risk appraisal and decision making
G Tziralis, K Kirytopoulos, A Rentizelas, I Tatsiopoulos
Managerial and decision economics 30 (6), 393-403, 2009
422009
An analytic network process approach for sales forecasting
D Voulgaridou, K Kirytopoulos, V Leopoulos
Operational Research 9 (1), 35-53, 2009
392009
Risk management as a strategic issue for the implementation of ERP systems: a case study from the oil industry
IP Tatsiopoulos, NA Panayiotou, K Kirytopoulos, K Tsitsiriggos
International Journal of Risk Assessment and Management 4 (1), 20-35, 2003
362003
Challenges and competencies for project management in the Australian public service
C Blixt, K Kirytopoulos
International Journal of Public Sector Management, 2017
342017
A process reference model for claims management in construction supply chains: The contractors’ perspective
DRI Stamatiou, KA Kirytopoulos, ST Ponis, S Gayialis, I Tatsiopoulos
International Journal of Construction Management 19 (5), 382-400, 2019
322019
Risk management: a competitive advantage in the purchasing function
VN Leopoulos, KA Kirytopoulos
Production Planning & Control 15 (7), 678-687, 2004
302004
Evaluating the role of risk assessment for road tunnel fire safety: A comparative review within the EU
P Ntzeremes, K Kirytopoulos
Journal of traffic and transportation engineering (English edition) 6 (3 …, 2019
292019
An effective Markov based approach for calculating the Limit Matrix in the analytic network process
K Kirytopoulos, D Voulgaridou, A Platis, V Leopoulos
European Journal of Operational Research 214 (1), 85-90, 2011
292011
Applying a stochastic-based approach for developing a quantitative risk assessment method on the fire safety of underground road tunnels
P Ntzeremes, K Kirytopoulos
Tunnelling and underground space technology 81, 619-631, 2018
282018
Taxonomy of risks in PPP transportation projects: a systematic literature review
PT Le, K Kirytopoulos, N Chileshe, R Rameezdeen
International Journal of Construction Management 22 (2), 166-181, 2022
272022
The system can't perform the operation now. Try again later.
Articles 1–20