关注
Bilal M. Ayyub
Bilal M. Ayyub
在 umd.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Probability, statistics, and reliability for engineers and scientists
BM Ayyub, RH McCuen
CRC press, 2016
8982016
Risk analysis in engineering and economics
BM Ayyub
Chapman and Hall/CRC, 2003
7592003
Systems resilience for multihazard environments: Definition, metrics, and valuation for decision making
BM Ayyub
Risk analysis 34 (2), 340-355, 2014
7042014
Elicitation of expert opinions for uncertainty and risks
BM Ayyub
CRC press, 2001
6762001
Uncertainty modeling and analysis in engineering and the sciences
BM Ayyub, GJ Klir
Chapman and Hall/CRC, 2006
5282006
Fuzzy regression methods–a comparative assessment
YHO Chang, BM Ayyub
Fuzzy sets and systems 119 (2), 187-203, 2001
4362001
Practical structural reliability techniques
BM Ayyub, A Haldar
Journal of structural engineering 110 (8), 1707-1724, 1984
2841984
Practical resilience metrics for planning, design, and decision making
BM Ayyub
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A …, 2015
2412015
Uncertainties in material and geometric strength and load variables
PE Hess, D Bruchman, IA Assakkaf, BM Ayyub
Naval engineers journal 114 (2), 139-166, 2002
2262002
Uncertainty modeling and analysis in civil engineering
BM Ayyub
CRC Press, 1997
2221997
Resiliency assessment of urban rail transit networks: Shanghai metro as an example
D Zhang, F Du, H Huang, F Zhang, BM Ayyub, M Beer
Safety Science 106, 230-243, 2018
2092018
Risk assessment of aging ship hull structures in the presence of corrosion and fatigue
UO Akpan, TS Koko, B Ayyub, TE Dunbar
Marine structures 15 (3), 211-231, 2002
1792002
A fuzzy morphology: a logical approach
BM Ayyub, MM Gupta, B De Baets
Uncertainty Analysis in Engineering and Sciences: Fuzzy Logic, Statistics …, 1998
1751998
Risk analysis for critical asset protection
WL McGill, BM Ayyub, M Kaminskiy
Risk Analysis: an international journal 27 (5), 1265-1281, 2007
1702007
Experimental study of prestressed composite beams
H Saadatmanesh, P Albrecht, BM Ayyub
Journal of structural engineering 115 (9), 2348-2363, 1989
1681989
Project scheduling using fuzzy set concepts
BM Ayyub, A Haldar
Journal of Construction Engineering and Management 110 (2), 189-204, 1984
1681984
Analysis of recent US structural and construction failures
ZA Eldukair, BM Ayyub
Journal of performance of constructed facilities 5 (1), 57-73, 1991
1561991
Structural reliability assessment using Latin hypercube sampling
BM Ayyub, KL Lai
Structural safety and reliability, 1177-1184, 1989
1381989
Load and resistance factor design (LRFD) for deep foundations, NCHRP Report 507
SG Paikowsky, B Birgisson, M McVay, T Nguyen, C Kuo, G Baecher, ...
Transportation Research Board, Washington, DC 76, 2004
1372004
Prestressed composite girders under positive moment
BM Ayyub, YG Sohn, H Saadatmanesh
Journal of structural engineering 116 (11), 2931-2951, 1990
1351990
系统目前无法执行此操作,请稍后再试。
文章 1–20