关注
M Arslan Ornek
M Arslan Ornek
在 yasar.edu.tr 的电子邮件经过验证
标题
引用次数
引用次数
年份
A simulation based experimental design to analyze factors affecting production flow time
BY Ekren, AM Ornek
Simulation Modelling Practice and Theory 16 (3), 278-293, 2008
742008
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
Journal of Manufacturing Systems 36, 147-158, 2015
412015
Balancing and scheduling of flexible mixed model assembly lines
C Öztürk, S Tunalı, B Hnich, MA Örnek
Constraints 18, 434-469, 2013
402013
Simulation analysis of lot streaming in job shops with transportation queue disciplines
RS Edis, A Ornek
Simulation Modelling Practice and Theory 17 (2), 442-453, 2009
392009
A vehicle scheduling problem with fixed trips and time limitations
DT Eliiyi, A Ornek, SS Karakütük
International Journal of Production Economics 117 (1), 150-161, 2009
352009
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67, 2577-2591, 2013
342013
Capacitated lot sizing with alternative routings and overtime decisions
AM Ornek, O Cengiz
International Journal of Production Research 44 (24), 5363-5389, 2006
322006
Capacitated lot sizing with linked lots for general product structures in job shops
C Oztürk, AM Ornek
Computers & Industrial Engineering 58 (1), 151-164, 2010
312010
Operational extended model formulations for advanced planning and scheduling systems
C Öztürk, AM Ornek
Applied Mathematical Modelling 38 (1), 181-195, 2014
302014
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
272010
A tabu search-based heuristic for single-product lot streaming problems in flow shops
R Sancar Edis, MA Ornek
The International Journal of Advanced Manufacturing Technology 43, 1202-1213, 2009
252009
An improved metric for measuring multi-item multi-level schedule instability under rolling schedules
KE Kabak, AM Ornek
Computers & Industrial Engineering 56 (2), 691-707, 2009
252009
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS.
C Ozturk, MA Ornek
International Journal of Industrial Engineering 23 (1), 2016
232016
The Determination of InProcess Inventory and Manufacturing Lead Time in MultiStage Production Systems
MA Ornek, PI Collier
International Journal of Operations & Production Management 8 (1), 74-80, 1988
201988
Determining optimum (s, S) levels of floor stock items in a paint production environment
BY Ekren, MA Ornek
Simulation Modelling Practice and Theory 57, 133-141, 2015
172015
A MIP based heuristic for capacitated MRP systems
C Öztürk, AM Örnek
Computers & Industrial Engineering 63 (4), 926-942, 2012
172012
Integer and constraint programming model formulations for flight-gate assignment problem
MA Ornek, C Ozturk, I Sugut
Operational Research 22 (1), 135-163, 2022
152022
A note on A mixed integer programming model for advanced planning and scheduling (APS)
MA Örnek, S Özpeynirci, C Ozturk
European Journal of Operatıonal Research, 2010
142010
An application of a circular economy approach to design an energy-efficient heat recovery system
SS Karakutuk, S Akpinar, MA Ornek
Journal of Cleaner Production 320, 128851, 2021
112021
A goal programming approach to lean production system implementation
SS Karakutuk, MA Ornek
Journal of the Operational Research Society 74 (1), 403-416, 2023
102023
系统目前无法执行此操作,请稍后再试。
文章 1–20