Follow
Nuno Fernandes
Nuno Fernandes
Instituto Politecnico de Castelo Branco, Escola Superior de Tecnologia
Verified email at ipcb.pt
Title
Cited by
Cited by
Year
Generic POLCA—A production and materials flow control mechanism for quick response manufacturing
NO Fernandes, S do Carmo-Silva
International Journal of Production Economics 104 (1), 74-84, 2006
1242006
TPM implementation and maintenance strategic plan–a case study
G Pinto, FJG Silva, A Baptista, NO Fernandes, R Casais, C Carvalho
Procedia Manufacturing 51, 1423-1430, 2020
802020
Introduction to multiple helix ecosystems for sustainable competitiveness
M Peris-Ortiz, JJ Ferreira, L Farinha, NO Fernandes
Multiple helix ecosystems for sustainable competitiveness, 1-13, 2016
742016
Implementing a maintenance strategic plan using TPM methodology
GF Correia Pinto, F José Gomes da Silva, N Octávio Garcia Fernandes, ...
International Journal of Industrial Engineering and Management 11 (3), 192-204, 2020
682020
Improving the machining process of the metalworking industry using the lean tool SMED
C Monteiro, LP Ferreira, NO Fernandes, JC Sá, MT Ribeiro, FJG Silva
Procedia Manufacturing 41, 555-562, 2019
642019
Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation
M Thürer, NO Fernandes, M Stevenson
International Journal of Production Research 60 (3), 1036-1050, 2022
542022
Workload control under continuous order release
NO Fernandes, S Carmo-Silva
International Journal of Production Economics 131 (1), 257-262, 2011
502011
Order release in a workload controlled flow-shop with sequence-dependent set-up times
NO Fernandes, S Carmo-Silva
International Journal of Production Research 49 (8), 2443-2454, 2011
422011
Predicting COVID-19 vaccination intention: the determinants of vaccine hesitancy
N Fernandes, D Costa, D Costa, J Keating, J Arantes
Vaccines 9 (10), 1161, 2021
412021
The impact of SSRIs on mortality and cardiovascular events in patients with coronary artery disease and depression: systematic review and meta-analysis
N Fernandes, L Prada, MM Rosa, JJ Ferreira, J Costa, FJ Pinto, ...
Clinical Research in Cardiology 110, 183-193, 2021
392021
Workload control in unbalanced job shops
NO Fernandes, MJ Land, S Carmo-Silva
International Journal of Production Research 52 (3), 679-690, 2014
382014
On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation
M Thürer, NO Fernandes, M Stevenson, T Qu
International Journal of Production Research 55 (16), 4695-4711, 2017
352017
Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release
NO Fernandes, M Thürer, C Silva, S Carmo-Silva
International Journal of Production Economics 194, 181-189, 2017
332017
Improving the machining process of the metalwork industry by upgrading operative sequences, standard manufacturing times and production procedure changes
C Monteiro, LP Ferreira, NO Fernandes, FJG Silva, I Amaral
Procedia Manufacturing 38, 1713-1722, 2019
282019
Order release in the hybrid MTO–FTO production
NO Fernandes, C Silva, S Carmo-Silva
International Journal of Production Economics 170, 513-520, 2015
282015
Lean manufacturing applied to a wiring production process
R Pena, LP Ferreira, FJG Silva, JC Sá, NO Fernandes, T Pereira
Procedia Manufacturing 51, 1387-1394, 2020
272020
Centralised vs. decentralised control decision in card-based control systems: comparing kanban systems and COBACABANA
M Thürer, NO Fernandes, M Stevenson, T Qu, CD Li
International Journal of Production Research 57 (2), 322-337, 2019
272019
Literature review on autonomous production control methods
L Martins, MLR Varela, NO Fernandes, S Carmo–Silva, J Machado
Enterprise Information Systems 14 (8), 1219-1231, 2020
262020
Aligning workload control theory and practice: lot splitting and operation overlapping issues
NO Fernandes, MJ Land, S Carmo-Silva
International Journal of Production Research 54 (10), 2965-2975, 2016
262016
Workload control and optimised order release: an assessment by simulation
NO Fernandes, M Thürer, TM Pinho, P Torres, S Carmo-Silva
International Journal of Production Research 58 (10), 3180-3193, 2020
242020
The system can't perform the operation now. Try again later.
Articles 1–20