Follow
Amir Nourmohammadi
Title
Cited by
Cited by
Year
Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS
A Nourmohammadi, M Zandieh
International Journal of Production Research 49 (10), 2833-2855, 2011
692011
Balancing and scheduling assembly lines with human-robot collaboration tasks
A Nourmohammadi, M Fathi, AHC Ng
Computers & Operations Research, 105674, 2022
632022
An imperialist competitive algorithm for multi-objective U-type assembly line design
A Nourmohammadi, M Zandieh, R Tavakkoli-Moghaddam
Journal of Computational Science 4 (5), 393-400, 2013
562013
An improved genetic algorithm with variable neighborhood search to solve the assembly line balancing problem
M Fathi, A Nourmohammadi, AHC Ng, A Syberfeldt, H Eskandari
Engineering Computations 37 (2), 501-521, 2020
312020
Design of stochastic assembly lines considering line balancing and part feeding with supermarkets
A Nourmohammadi, H Eskandari, M Fathi
Engineering Optimization 51 (1), 63-83, 2019
292019
Assembly line design considering line balancing and part feeding
A Nourmohammadi, H Eskandari
Assembly Automation 37 (1), 135-143, 2017
252017
An optimization model for balancing assembly lines with stochastic task times and zoning constraints
M Fathi, A Nourmohammadi, AHC Ng, A Syberfeldt
IEEE Access 7, 32537-32550, 2019
232019
Integrated locating in-house logistics areas and transport vehicles selection problem in assembly lines
A Nourmohammadi, H Eskandari, M Fathi, AHC Ng
International Journal of Production Research 59 (2), 598-616, 2021
222021
Production sustainability via supermarket location optimization in assembly lines
M Fathi, A Nourmohammadi, M Ghobakhloo, M Yousefi
Sustainability 12 (11), 4728, 2020
212020
A water-flow like algorithm for solving U-shaped assembly line balancing problems
A Nourmohammadi, M Fathi, M Zandieh, M Ghobakhloo
IEEE Access 7, 129824-129833, 2019
182019
An integrated model for cost-oriented assembly line balancing and parts feeding with supermarkets
A Nourmohammadi, H Eskandari, M Fathi, MR Bourani
Procedia Cirp 72, 381-385, 2018
172018
A mathematical model for supermarket location problem with stochastic station demands
A Nourmohammadi, H Eskandari, M Fathi, M Aghdasi
Procedia CIRP 72, 444-449, 2018
92018
Decreasing the crane working time in retrieving the containers from a bay
E Azari, H Eskandari, A Nourmohammadi
Scientia Iranica 24 (1), 309-318, 2017
92017
A genetic algorithm for heterogenous human-robot collaboration assembly line balancing problems
A Nourmohammadi, M Fathi, AHC Ng, E Mahmoodi
Procedia CIRP 107, 1444-1448, 2022
82022
Multi-objective optimisation of tool indexing problem: a mathematical model and a modified genetic algorithm
K Amouzgar, A Nourmohammadi, AHC Ng
International Journal of Production Research 59 (12), 3572-3590, 2021
82021
Choosing efficient meta-heuristics to solve the assembly line balancing problem: A landscape analysis approach
A Nourmohammadi, M Fathi, AHC Ng
Procedia CIRP 81, 1248-1253, 2019
72019
Multi-objective optimization of mixed-model assembly lines incorporating musculoskeletal risks assessment using digital human modeling
A Nourmohammadi, AHC Ng, M Fathi, J Vollebregt, L Hanson
CIRP Journal of Manufacturing Science and Technology 47, 71-85, 2023
52023
An enhanced simulation-based multi-objective optimization approach with knowledge discovery for reconfigurable manufacturing systems
CA Barrera-Diaz, A Nourmohammadi, H Smedberg, T Aslam, AHC Ng
Mathematics 11 (6), 1527, 2023
32023
Knowledge-Driven Multi-Objective Optimization for Reconfigurable Manufacturing Systems
H Smedberg, CA Barrera-Diaz, A Nourmohammadi, S Bandaru, AHC Ng
Mathematical and Computational Applications 27 (6), 106, 2022
22022
Balancing and scheduling human-robot collaborated assembly lines with layout and objective consideration
A Nourmohammadi, M Fathi, AHC Ng
Computers & industrial engineering 187, 109775, 2024
12024
The system can't perform the operation now. Try again later.
Articles 1–20