关注
Emad Roghanian
Emad Roghanian
其他姓名E. Roghanian, عماد روغنیان
Associated Professor of Industrial Engineering-K. N. Toosi University of Technology (KNTU
在 kntu.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
A probabilistic bi-level linear multi-objective programming problem to supply chain planning
E Roghanian, SJ Sadjadi, MB Aryanezhad
Applied Mathematics and computation 188 (1), 786-800, 2007
2272007
An optimization model for reverse logistics network under stochastic environment by using genetic algorithm
E Roghanian, P Pazhoheshfar
Journal of Manufacturing Systems 33 (3), 348-356, 2014
1972014
A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations
EN Afruzi, AA Najafi, E Roghanian, M Mazinani
Computers & Operations Research 50, 80-96, 2014
1162014
Facility layout planning. An extended literature review
P Pérez-Gosende, J Mula, M Díaz-Madroñero
International Journal of Production Research 59 (12), 3777-3816, 2021
1142021
A framework for sustainable product design: a hybrid fuzzy approach based on quality function deployment for environment
M Younesi, E Roghanian
Journal of Cleaner Production 108, 385-394, 2015
1082015
List of references on evolutionary multiobjective optimization
CAC Coello
URL< http://www. lania. mx/~ ccoello/EMOO/EMOObib. html, 2010
1042010
Comparison of first aggregation and last aggregation in fuzzy group TOPSIS
E Roghanian, J Rahimi, A Ansari
Applied Mathematical Modelling 34 (12), 3754-3766, 2010
1002010
Sustainable, resilient and responsive mixed supply chain network design under hybrid uncertainty with considering COVID-19 pandemic disruption
MM Vali-Siar, E Roghanian
Sustainable production and consumption 30, 278-300, 2022
812022
Extension of Fuzzy ELECTRE based on VIKOR method
A Zandi, E Roghanian
Computers & Industrial Engineering 66 (2), 258-263, 2013
782013
Addressing a set of meta-heuristics to solve a multi-objective model for closed-loop citrus supply chain considering CO2 emissions
E Roghanian, A Cheraghalipour
Journal of cleaner production 239, 118081, 2019
692019
An improved fuzzy critical chain approach in order to face uncertainty in project scheduling
E Roghanian, M Alipour, M Rezaei
International Journal of Construction Management 18 (1), 1-13, 2018
662018
An empirical study of Iranian regional airports using robust data envelopment analysis
E Roghanian, A Foroughi
International Journal of Industrial Engineering Computations 1 (1), 65-72, 2010
552010
A three-phase heuristic approach for reverse logistics network design incorporating carbon footprint
KN Reddy, A Kumar, EEF Ballantyne
International Journal of Production Research 57 (19), 6090-6114, 2019
492019
A fuzzy model for achieving lean attributes for competitive advantages development using AHP-QFD-PROMETHEE
E Roghanian, M Alipour
Journal of Industrial Engineering International 10, 1-11, 2014
492014
Supply chain network optimization: A review of classification, models, solution techniques and future research
N Matinrad, E Roghanian, Z Rasi
Uncertain Supply chain management 1 (1), 1-24, 2013
472013
A multi-mode resource-constrained discrete time–cost tradeoff problem solving using an adjusted fuzzy dominance genetic algorithm
EN Afruzi, E Roghanian, AA Najafi, M Mazinani
Scientia Iranica 20 (3), 931-944, 2013
452013
Parallel variable neighborhood search for solving fuzzy multi-objective dynamic facility layout problem
M Abedzadeh, M Mazinani, N Moradinasab, E Roghanian
The International Journal of Advanced Manufacturing Technology 65, 197-211, 2013
402013
Integrating goal programming, Kuhn–Tucker conditions, and penalty function approaches to solve linear bi-level programming problems
E Roghanian, MB Aryanezhad, SJ Sadjadi
Applied Mathematics and Computation 195 (2), 585-590, 2008
392008
An application of fuzzy TOPSIS to improve the process of supply chain management in the food industries: A case study of protein products manufacturing company
E Roghanian, A Sheykhan, E Abendankashi
Decision Science Letters 3 (1), 17-26, 2014
312014
Monitoring and change point estimation of AR (1) autocorrelated polynomial profiles
M Khedmati, ME Soleymanian, M Keramatpour, STA Niaki
International Journal of Engineering 26 (9), 933-942, 2013
312013
系统目前无法执行此操作,请稍后再试。
文章 1–20