Analysis of a New Vehicle Scheduling and Location Problem EK Bish, TY Leong, CL Li, JWC Ng, D Simchi‐Levi Naval Research Logistics (NRL) 48 (5), 363-385, 2001 | 232 | 2001 |
Dispatching Vehicles in a Mega Container Terminal B EK, FY Chen, TY Leong, BL Nelson, JWC Ng, D Simchi-Levi OR Spectrum 27 (4), 491-506, 2005 | 208* | 2005 |
Deterministic Approximations to Co-production Problems with Service Constraints and Random Yield GR Bitran, TY Leong Management Science 38 (5), 724-742, 1992 | 93 | 1992 |
Teaching Business Modeling using Spreadsheets TY Leong, MLF Cheong INFORMS Transactions on Education 9 (1), 20-34, 2008 | 40 | 2008 |
Multi-period Combinatorial Auction Mechanism for Distributed Resource Allocation and Scheduling HC Lau, SF Cheng, TY Leong, JH Park, Z Zhao Proceedings of the 2007 IEEE/WIC/ACM International Conference on Intelligent …, 2007 | 38 | 2007 |
Dispatching automated guided vehicles in a mega container terminal Y Chen, YT Leong, JWC Ng, EK Demir, BL Nelson, D Simchi-Levi INFORMS Montreal 5 (2), 102-111, 1998 | 34 | 1998 |
Optimal Cruise Itinerary Design Development TY Leong, SP Ladany International Journal of Services Technology and Management 2 (1), 130-141, 2001 | 25 | 2001 |
Simpler Spreadsheet Simulation of Multi-server Queues TY Leong INFORMS Transactions on Education 7 (2), 172-177, 2007 | 20 | 2007 |
Co-production of Substitutable Products GB Bitran, TY Leong Production Planning & Control 6 (1), 13-25, 1995 | 14 | 1995 |
Monte Carlo Spreadsheet Simulation using Resampling TY Leong INFORMS Transactions on Education 7 (3), 2007 | 13 | 2007 |
Business Modeling with Spreadsheets: Problems, Principles and Practice, Second edition TY Leong, LF Cheong McGraw-Hill, 2011 | 12* | 2011 |
Deterministic approximations to co-production problems with service constraints GR Bitran, TY Leong Sloan School of Management, Massachusetts Institute of Technology, 1989 | 11 | 1989 |
Spreadsheet Data Resampling for Monte-Carlo Simulation TY Leong, WL Lee Spreadsheet in Education 3 (1), 70-78, 2008 | 10 | 2008 |
Hotel Sales and Reservations Planning GR Bitran, TY Leong | 9 | 1989 |
Multi–party Multi–period Supply Chain Coordination TY Leong, MLF Cheong International Journal of Industrial and Systems Engineering 10 (3), 300-318, 2012 | 7 | 2012 |
Hotel Sales and Reservations Planning GR Bitran, SM Gilbert, TY Leong The Service Productivity and Quality Challenge, 343-363, 1995 | 7 | 1995 |
Optimization Techniques and Applications KH Phua, CM Wang, WY Yeong, TY Leong, HT Loh, KC Tan, FS Chou Optimization Techniques and Applications, 1-1264, 1992 | 7 | 1992 |
A Hierarchical Decision Support System for University Examination Scheduling TY Leong, WY Yeong working paper, National University of Singapore, 1990 | 7 | 1990 |
Examination scheduling: A quadratic assignment perspective TY Leong, WY Yeong Proc. Int. Conf. on Optimization: Techniques and Applications, 550-558, 1987 | 7 | 1987 |
Bidirectional Flow Shop Scheduling with Multi-machine Capacity and Critical Operation Sequencing ZY Zhao, TY Leong, SS Ge, HC Lau Intelligent Control, 2007. ISIC 2007. IEEE 22nd International Symposium on …, 2007 | 6 | 2007 |