关注
Mir Bahador Aryanezhad
Mir Bahador Aryanezhad
Iran university of science & technology
没有经过验证的电子邮件地址
标题
引用次数
引用次数
年份
A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty
SMJ Mirzapour Al-E-Hashem, H Malekly, MB Aryanezhad
International journal of production economics 134 (1), 28-42, 2011
4272011
A game theory approach in seller–buyer supply chain
M Esmaeili, MB Aryanezhad, P Zeephongsekul
European Journal of Operational Research 195 (2), 442-448, 2009
3942009
A probabilistic bi-level linear multi-objective programming problem to supply chain planning
E Roghanian, SJ Sadjadi, MB Aryanezhad
Applied Mathematics and computation 188 (1), 786-800, 2007
2272007
An EOQ model with partial delayed payment and partial backordering
AA Taleizadeh, DW Pentico, MS Jabalameli, M Aryanezhad
Omega 41 (2), 354-368, 2013
1842013
Solving a dynamic cell formation problem using metaheuristics
R Tavakkoli-Moghaddam, MB Aryanezhad, N Safaei, A Azaron
Applied Mathematics and Computation 170 (2), 761-780, 2005
1752005
A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method
A Ahi, MB Aryanezhad, B Ashtiani, A Makui
Computers & Operations Research 36 (5), 1478-1496, 2009
1592009
New competitive results for the stochastic resource-constrained project scheduling problem: Exploring the benefits of pre-processing
B Ashtiani, R Leus, MB Aryanezhad
Journal of Scheduling 14, 157-171, 2011
1402011
An economic order quantity model with multiple partial prepayments and partial backordering
AA Taleizadeh, DW Pentico, MS Jabalameli, M Aryanezhad
Mathematical and Computer Modelling 57 (3-4), 311-323, 2013
1362013
Dynamic cell formation and the worker assignment problem: a new model
MB Aryanezhad, V Deljoo, SMJ Mirzapour Al-e-Hashem
The International Journal of Advanced Manufacturing Technology 41, 329-342, 2009
1352009
A new method for location selection: a hybrid analysis
M Tabari, A Kaboli, MB Aryanezhad, K Shahanaghi, A Siadat
Applied Mathematics and Computation 206 (2), 598-606, 2008
1202008
A hybrid method of fuzzy simulation and genetic algorithm to optimize constrained inventory control systems with stochastic replenishments and fuzzy demand
AA Taleizadeh, STA Niaki, MB Aryanezhad, N Shafii
Information sciences 220, 425-441, 2013
1092013
A hybrid method of Pareto, TOPSIS and genetic algorithm to optimize multi-product multi-constraint inventory control systems with random fuzzy replenishments
AA Taleizadeh, STA Niaki, MB Aryanezhad
Mathematical and Computer Modelling 49 (5-6), 1044-1057, 2009
1072009
An improved algorithm for optimizing product mix under the theory of constraints
MB Aryanezhad, AR Komijan*
International Journal of Production Research 42 (20), 4221-4233, 2004
972004
A genetic algorithm to optimize multiproduct multiconstraint inventory control systems with stochastic replenishment intervals and discount
AA Taleizadeh, STA Niaki, MB Aryanezhad, AF Tafti
The International Journal of Advanced Manufacturing Technology 51, 311-323, 2010
962010
Using genetic algorithm to solve dynamic cell formation problem
V Deljoo, SMJ Mirzapour Al-e-hashem, F Deljoo, MB Aryanezhad
Applied Mathematical Modelling 34 (4), 1078-1092, 2010
892010
Reducing outpatient waiting time: a simulation modeling approach
A Aeenparast, SJ Tabibi, K Shahanaghi, MB Aryanejhad
Iranian Red Crescent Medical Journal 15 (9), 865, 2013
872013
An economic order quantity model with partial backordering and a special sale price
AA Taleizadeh, DW Pentico, M Aryanezhad, SM Ghoreyshi
European Journal of Operational Research 221 (3), 571-583, 2012
872012
An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment
SMJM Al-e-Hashem, MB Aryanezhad, SJ Sadjadi
The international journal of advanced manufacturing technology 58, 765-782, 2012
852012
Designing safe job rotation schedules based upon workers’ skills
MB Aryanezhad, AS Kheirkhah, V Deljoo, SMJ Mirzapour Al-e-hashem
The International Journal of Advanced Manufacturing Technology 41, 193-199, 2009
832009
Optimal production and marketing planning
SJ Sadjadi, M Oroujee, MB Aryanezhad
Computational Optimization and Applications 30, 195-203, 2005
822005
系统目前无法执行此操作,请稍后再试。
文章 1–20