关注
Dr.-Ing. Abdur Rehman Nasir
Dr.-Ing. Abdur Rehman Nasir
Senior Lecturer in Project Management and Digital Construction
在 herts.ac.uk 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Current state and barriers to the circular economy in the building sector: Towards a mitigation framework
M Bilal, KIA Khan, MJ Thaheem, AR Nasir
Journal of Cleaner Production, 123250, 2020
1912020
Is BIM Adoption Advantageous for Construction Industry of Pakistan?
R Masood, MKN Kharal, AR Nasir
Procedia Engineering 77, 229-238, 2014
1392014
Exploring the role of building information modeling in construction safety through science mapping
R Akram, MJ Thaheem, AR Nasir, TH Ali, S Khan
Safety Science 120, 456-470, 2019
902019
Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects
MF Arshad, MJ Thaheem, AR Nasir, MSA Malik
Journal of Construction Engineering and Management 145 (4), 04019010, 2019
752019
BIM-based claims management system: A centralized information repository for extension of time claims
B Ali, H Zahoor, AR Nasir, A Maqsoom, RWA Khan, KM Mazher
Automation in Construction 110, 102937, 2020
682020
Project schedule risk management through building information modelling
M Sami Ur Rehman, MJ Thaheem, AR Nasir, KIA Khan
International Journal of Construction Management, 1-11, 2020
642020
Cost and Time Overruns in Highway Projects of Pakistan
AR Nasir, HF Gabriel, RM Choudhry
64*
Effect of stakeholder’s conflicts on project constraints: a tale of the construction industry
M Irfan, MJ Thaheem, HF Gabriel, MSA Malik, AR Nasir
International Journal of Conflict Management, 2019
412019
An Approach to Develop Video Tutorials for Construction Tasks
AR Nasir, HJ Bargstädt
Procedia Engineering 196, 1088-1097, 2017
402017
Managing risk in green building projects: toward a dedicated framework
N Javed, MJ Thaheem, B Bakhtawar, AR Nasir, KIA Khan, HF Gabriel
Smart and Sustainable Built Environment, 2019
222019
BIMp-Chart—A Global Decision Support System for Measuring BIM Implementation Level in Construction Organizations. Sustainability 2021, 13, 9270
Q Malik, AR Nasir, R Muhammad, MJ Thaheem, F Ullah, KIA Khan, ...
s Note: MDPI stays neu-tral with regard to jurisdictional claims in …, 2021
20*2021
Circular Economy in the Construction Industry: A Step towards Sustainable Development
M Ghufran, KIA Khan, F Ullah, AR Nasir, AA Al Alahmadi, AN Alzaed, ...
Buildings 12 (7), 1004, 2022
172022
Tacit knowledge sharing in construction: a system dynamics approach
MB Tahir, KIA Khan, AR Nasir
Asian Journal of Civil Engineering, 1-21, 2021
172021
Adoption of Sustainable Supply Chain Management for Performance Improvement in the Construction Industry: A System Dynamics Approach
M Ghufran, KIA Khan, MJ Thaheem, AR Nasir, F Ullah
Architecture 1 (2), 161-182, 2021
152021
Exploring the Role of BIM in Construction Safety in Developing Countries: Toward Automated Hazard Analysis
R Akram, MJ Thaheem, S Khan, AR Nasir, A Maqsoom
Sustainability 14 (19), 12905, 2022
112022
CAN BIM SUPPORT BETTER WORKING CONDITIONS FOR LOW-SKILLED LABOR?
HJ BARGSTÄDT, AR NASIR, EV IGNATOVA
Published at Teesside University, UK, by Teesside University КОНФЕРЕНЦИЯ …, 2014
102014
BIM Roles and Responsibilities in Developing Countries: A Dedicated Matrix for Design-Bid-Build Projects
UEH Habib, AR Nasir, F Ullah, S Qayyum, MJ Thaheem
Buildings 12 (10), 1752, 2022
82022
Integrating BIM in Construction Dispute Resolution: Development of a Contractual Framework
R Muhammad, AR Nasir
Buildings 12 (11), 1828, 2022
72022
BIM aided information and visualization repository for managing construction delay claims
B Ali, H Zahoor, A Aibinu, AR Nasir, A Tariq, U Imran, RM Khan
Journal of Information Technology in Construction (ITcon) 26 (54), 1023-1040, 2021
62021
ConSafe4All: A framework for language friendly safety training modules
M Arif, AR Nasir, MJ Thaheem, KIA Khan
Safety Science 141, 105329, 2021
62021
系统目前无法执行此操作,请稍后再试。
文章 1–20