Follow
Ravindu Kahandawa
Ravindu Kahandawa
Lecturer in Quantity Surveying
Verified email at massey.ac.nz - Homepage
Title
Cited by
Cited by
Year
Earthquake damage estimation systems: Literature review
K Kahandawa, ND Domingo, KS Park, SR Uma
Procedia engineering 212, 622-628, 2018
272018
Scientometric analysis of the global scientific literature on circularity indicators in the construction and Built Environment Sector
K Gomis, R Kahandawa, RS Jayasinghe
Sustainability 15 (1), 728, 2022
62022
Factors impacting post-earthquake damage repair cost estimations
R Kahandawa, N Domingo, G Chawynski, SR Uma
International Journal of Disaster Resilience in the Built Environment 12 (1 …, 2020
52020
Earthquake damage repair loss estimation in New Zealand: what other variables are essential based on experts’ opinions?
RK Kahandawa, ND Domingo, G Chawynski, SR Uma
Buildings 11 (9), 385, 2021
42021
Application of a performance-based framework to prioritise underutilised historical buildings for adaptive reuse in Auckland, New Zealand
IE Aigwi, J Rotimi, R Jafarzadeh, T Sorrell, AN Nwadike, A Le, ...
The 54th International Conference of the Architectural Science Association …, 2020
42020
Benefits, constraints and enablers of modular offsite construction (MOSC) in New Zealand high-rise buildings
WM Shahzad, SM Reddy, R Kahandawa, JOB Rotimi
Engineering, Construction and Architectural Management, 2023
32023
Factors affecting post-earthquake damage repair cost estimations
R Kahandawa, N Domingo, G Chawynski, SR Uma
22019
Generalised Linear Modelling for Construction Waste Estimation in Residential Projects: Case Study in New Zealand
N Domingo, HM Edirisinghe, R Kahandawa, G Wedawatta
Sustainability 16 (5), 1941, 2024
2024
Methods to Include the Impact of Factors in Postearthquake Cost Estimations for Earthquake Damage Repair Work
R Kahandawa, N Domingo, G Chawynski, SR Uma
Natural Hazards Review 25 (1), 04023053, 2024
2024
Cost Management of Building Construction Projects
T Jayawickrama, R Jayasinghe, R Kahandawa, R Rameezdeen, ...
Building Cost Planning: Best Practices and insights, 2023
2023
Cost estimation model for earthquake damage repair in New Zealand: a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in …
KARVD Kahandawa
Massey University, 2021
2021
Investigation into the factors affecting costs of earthquake damage repair work
R Kahandawa, N Domingo, G Chawynski, SR Uma
https://ir.canterbury.ac.nz/handle/10092/17186, 2019
2019
A review on time estimation methods for post-earthquake damage repair of buildings
K Kahandawa, ND Domingo, G Chawynski, RS Park, SR Uma
10th International Built Environment Research Conference - Design that cares …, 2017
2017
Partnering to bridge the gap between conventional and BIM based project procurement
K Kahandawa, HS Jayasena
Ceylon Institute of Builders, 2015
2015
Unlocking Circular Possibilities: Repurposing Options for Wind Turbine Blade Waste in the New Zealand
J Meldrum, P Vishnu, R Kahandawa, N Domingo
Available at SSRN 4537766, 0
The system can't perform the operation now. Try again later.
Articles 1–15