Follow
Gülçin BEKTUR
Gülçin BEKTUR
Iskenderun Technical University
Verified email at uiowa.edu
Title
Cited by
Cited by
Year
A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a …
G Bektur, T Saraç
Computers & Operations Research 103, 46-63, 2019
1282019
An integrated methodology for the selection of sustainable suppliers and order allocation problem with quantity discounts, lost sales and varying supplier availabilities
G Bektur
Sustainable Production and Consumption 23, 111-127, 2020
362020
KIDEM SEVİYELERİNE GÖRE İŞGÜCÜ ÇİZELGELEME PROBLEMİ: HİZMET SEKTÖRÜNDE BİR UYGULAMA
G Bektur, S Hasgül
Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 15 …, 2013
332013
Two parallel injection machine scheduling under crane constraint
G Bektur, T Saraç
Journal of the Faculty of Engineering and Architecture of Gazi University 31 (4), 2016
92016
An NSGA-II-Based Memetic Algorithm for an Energy-Efficient Unrelated Parallel Machine Scheduling Problem with Machine-Sequence Dependent Setup Times and Learning Effect
G Bektur
Arabian Journal for Science and Engineering, 2021
72021
DISTRIBUTED FLOW SHOP SCHEDULING PROBLEM WITH LEARNING EFFECT, SETUPS, NON-IDENTICAL FACTORIES, AND ELIGIBILITY CONSTRAINTS.
G Bektur
International Journal of Industrial Engineering 29 (1), 2022
62022
Okul Modellemeleri: Hizmet Sektöründe Bir Uygulama
G Bektur, S Hasgül
Afyon Kocatepe Üniversitesi, İİBF Dergisi, 385-402, 2019
62019
A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company
gülçin bektur
Afyon Kocatepe Üniversitesi İktisadi İdari Bilimler Fakültesi Dergisi, 2021
52021
A multi-start iterated tabu search algorithm for the multi-resource agent bottleneck generalized assignment problem
G Bektur
An International Journal of Optimization and Control: Theories …, 2020
52020
An integrated approach to supplier selection using AHP and FUZZY PROMETHEE
ÇÖL Gülçin, S HASGÜL
TOJSAT 3 (3), 1-7, 2013
52013
A hybrid heuristic solution based on simulated annealing algorithm for energy efficient single machine scheduling problem with sequence dependent setup times
G Bektur
Gazi Üniversitesi, 2021
42021
A variant of the NSGA II for the speed scaling distributed flow shop scheduling problem with total tardiness minimisation
G Bektur
Journal of Intelligent & Fuzzy Systems 45 (1), 1209-1222, 2023
22023
A Combined Approach for Sustainable Supplier Selection: A Case Study for a Manufacturing Firm
G Bektur
International Journal of Engineering Technologies 4 (3), 136-142, 2018
22018
A fuzzy approach for generalized project selection and scheduling problem with resource management
G Bektur
Aksaray Üniversitesi, 2022
12022
Enerji etkin ve sıra bağımlı hazırlık süreli tek makine çizelgeleme problemi için tavlama benzetimi algoritması tabanlı hibrit sezgisel çözüm önerisi
G Bektur
Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 36 (1), 407-420, 2021
12021
A MULTI-OBJECTIVE APPROACH TO HOME HEALTH CARE ROUTING PROBLEM WITH TEAM FORMATION
G Bektur, D Nembhard
International Journal of Industrial Engineering: Theory, Applications and …, 2023
2023
THE MATERIAL HANDLING SYSTEMS IN GREEN INTERNAL LOGISTICS AND AN APPLICATION
I Durtek, G Bektur
9th international congress on Engineering and Technology Management, 2023
2023
Ortak sunuculu bağımsız paralel makina çizelgeleme problemine sezgisel yaklaşım
gülçin bektur
Fen Bilimleri Enstitüsü, 2017
2017
İki paralel enjeksiyon makinasının kreyn kısıtı altında çizelgelenmesi
T SARAÇ, G BEKTUR
Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 31 (4), 903-911, 2016
2016
Kıdem seviyelerine göre işgücü çizelgeleme problemine hedef programlama yaklaşımı
gülçin bektur
Fen Bilimleri Enstitüsü, 2013
2013
The system can't perform the operation now. Try again later.
Articles 1–20